Project Brief

To design and build a totally unique, unrivalled facility using our extensive experience in data centre's to ensure uninterrupted power and cooling. No single point of failure, comprehensive security and exceptional connectivity.

details +
  • 22,000sq ft Tier IV Data Centre
  • 8MVA of dual diverse power
  • No single point of failure
  • S+S with full redundancy
  • 800mm deep raised floor
  • Complete hot aisle containment
  • Design PUE 1.08
  • Dual 11KV supplies
  • N+1 Eco Air Conditioning (dual electrical feed)
  • 2(N) UPS protection with 10 minutes autonomy
  • 2(N) Generator protection with 5(10) days fuel
  • Choice of 4 ISP's and 3 Telco/Fibre providers
  • Physically separate, fire proofed independent power supplies
  • Racks from 2-18kW
  • 4 Acre secure compound on 220 acre private Estate
  • 9M above sea level
  • Ample car parking
  • Ultra secure double perimeter

Project Timescale

Our design team anticipate completion of the design and instruction to commence occurring in January 2013. We'd expect the facility to be operational by 2014.